Stormwater & On-Site Detention: Designing to Satisfy Council First Time
How stormwater drainage and on-site detention (OSD) are designed for NSW developments — permissible site discharge, storage volume and coordinating tanks that earn their space.
Stormwater is often where a hydraulic design quietly saves money — or quietly adds cost. Councils across NSW require most new developments to control the rate at which stormwater leaves the site, and the way that control is engineered has a real impact on buildable floor area, excavation and construction cost.
The problem on-site detention solves
Developing a site usually increases the hard, impervious surfaces that shed water, so a storm produces more runoff, faster. If that extra flow is pushed straight into the public drainage system it can overwhelm it downstream. On-site detention (OSD) solves this by temporarily holding stormwater on the site and releasing it slowly, so the peak discharge after development is no greater than the council’s permissible site discharge allows.
What drives the storage volume
Two numbers dominate an OSD design:
- Permissible site discharge (PSD) — the maximum rate, set by council, at which water may leave the site.
- Site storage requirement (SSR) — the volume that must be detained to keep discharge at or below the PSD during the design storm.
Lower the allowable discharge and the required storage grows; the two are directly linked. Modelling the catchment properly — rather than applying a blanket rule — often reveals storage that is both compliant and meaningfully smaller.
Make the tank earn its space
The best stormwater designs look for tanks that do more than one job. A detention tank can sometimes be combined with rainwater reuse storage, or shaped and positioned so it slots into otherwise unusable basement or landscape space. Thinking about this early — while the structure and civil works are still fluid — is what turns a tank from a floor-area penalty into an efficient piece of infrastructure.
Coordinated below ground
Stormwater drainage runs below ground alongside sanitary drainage, hydrant mains and civil services, all competing for falls and cover. Because NEPA coordinates hydraulic design with every other discipline and the civil works, drainage is set out cleanly the first time — reducing clashes on site and giving council submissions the best chance of approval without rework.